Live chat by BoldChat
Search

Contact Us

Ready to roll on your project? Let's get together to chat and make things happen. Start by sending me a quick note and you can expect a prompt reply.

This form does not yet contain any fields.
    Services
  • Bathroom Design
  • Complete Bathroom Remodeling
  • Bathroom Expansions/Additions
  • Tub Removal & Replacement
  • Custom Tile Showers
  • Steam Showers
  • Tile Walls & Floors
  • Custom Swanstone Showers
  • Venting Systems
  • Vanities & Cabinets
  • Pocket Door Installations
  • Basement Makeovers
  • Basement Bathrooms
  • Universal Access Bathrooms
  • Beadboard Wainscot
  • Kitchen Design
  • Complete Kitchen Remodeling
  • Kitchen Expansions/Additions
  • Wall Removal
  • Structual Changes
  • Window Replacement
  • Door Replacement
  • Complete Remodeling Services
  • Required

    Massachusetts C.S.L #065629
    Massachusetts H.I.C. #14574

    Feedback

    What Bugs You? 
    Does anything on this website bug you? Nothing is too small or too big.  If there is something we can fix, we'd love to know.

    Click here to report a bug! 

    Friday
    Jun292012

    Decked Out With Azek Decking On Cape Cod!

    New Deck and Hot Tub Platform

    We've recently wrapped up a deck make-over for a new client in Falmouth that was referred to us by another client. While not our typical project, we've actually built many decks over the years, so it was a good fit for us.

    In addition to rebuilding the deck, we had to build a concrete base for a hot tub and relocate/rebuild the stairs.

    A Horror Show In Progress

    When I first saw the deck and railings, I could not believe my eyes, for the deck had been painted white and grey when the house was built in 2006 and it looked like it had a bad case of the flakes, Paint was peeling and shedding off the decking, off the railings and even off the painted underside.  The ground around the deck was covered in a carpet of paint flakes and chips.

    Throwing Away Thousands of Dollars Worth of  Labor and Materials

    Regrettably we had to tear apart the upscale railings and throw them away along with the decking because it was not practical to try and save them. I winced thinking about how much work it had taken to build the railings and then 6 years later...poof! tear it all off and throw it way!

    All of the existing decking and railings were constructed with pressure treated lumber and then painted over with a solid latex paint. Even the nail holes in the decking were filled and painted. Unfortunately, the decking and railings were never allowed to dry out. All the moisture and chemicals that were still in the wood was trapped by the skin of the latex paint. In fact, when we took the railings apart, we found that the wrapped posts, were saturated with water and thousands of ants had taken up residence because they were attracted by the trapped moisture.

    In addition, we found that the framing had not been sufficiently secured and there was potential for major damage in the event of extreme winds such as a hurricane.

    Before reconstructing the deck, we poured a 12" reinforced slab on compacted stone to hold the hot tub. Over this slab, we installed pressure treated sleepers and then topped the sleepers with composite decking.

    The Reconstruction

    Once we added additional framing and hardware to completely secure the deck, we then proceeded to install new composite Azek decking. I LOVE AZEK!  This stuff is easy to work with, cuts and drills like wood and installs smoothly use the the color matched stainless screws.  Azek is consistent in width and thickness and has none of the downside of wood. It even comes in 20' lengths, thus reducing the number of butt joints.  The downside to Azek is that it is pricy and flops around like semi cooked spaghetti during installation.   However it's worth the cost, as its a once-in-your-life-time premium product.

    The railings were reconstructed using a railing system called Radiance Rail. This system has composite sleeves that slip down over a 4x4 post and then top & bottom rail with square ballasters is assembled and installed. To finish the railing off, a top rail is dropped into place and the posts are capped with a cover.

    We relocated and reconstructed the stairs so they would land on the deck we had built previously for the hot tub. These stairs are more comfortable then the old ones, as they were built with shorter more consistent riser heights. Going up and down these stairs feels natural and comfortable.

    Delighted Clients

    Our clients were delighted with the end results. They now have a low maintenance deck that was completed just in time for a week long large gathering of family members!  

    Below are some iPhone pictures of the completed deck.

    New deck completed. We wrapped the deck framing with AZEK beadboard to hide the ugly framing and provide some grounding to the entire deck

    Kick board on Stairs is AZEK trim

    Close up of stairs and railing Hot tub is supported by 12" reinforced concrete

     

    Tuesday
    May292012

    Dream Brewster Bathroom Remodel 

    Coming up later this summer, our team will transform a rabbit warren of a bathroom in Brewster into a stunning spa like retreat.  This bathroom remodel will be a total transformation featuring a curb-less shower, tile and fixtures from Italy throughout.  We'll install a heated floor, a complete custom shower configuration as well as a floating mahogany counter topped by vessel sinks and wall mounted faucets.  This will be an exciting project that will be documented from start to finish.  Be sure to check back for updates on our blog.

    Sunday
    Apr292012

    Creating A Fabulous New Bathroom In North Falmouth!

    May 2012 Finds the team from @designREMODEL working on a new bathroom project in North Falmouth. We just completed a kitchen remodel in West Falmouth and we just updated a deck for a long time client also in North Falmouth. 

    Located across the street from North Falmouth Elementary school, the owners of this Cape house enjoy a transformative first floor bathroom makeover that we completed back in 2009. In the interim we completed other projects as well.  In fact, one day this pass winter, I was driving by the house and noticed that the homeowners had some new landscaping done. I sent an email to them complementing them on the work and I got an immediate response:  "John, I was just thinking that I needed to contact you this week about getting our second floor bathroom remodeled and there you are in my email box!" 

    As my clients were very happy with the quality and durability of the fixtures, fittings and finishes in the first bathroom we had remodeled. Because of this, it was a fairly short, yet complete decision process on how the 2nd bathroom was going to be transformed.

    Day 1. We completely gutted the entire bathroom down to the wall studs.


    Day 2. Taking out the cast iron tub was no easy task. Fortunately it was a straight shot down the stairs and into the demo trailer!
    We had taken up the top layer of flooring and this allowed us to re-secure the sub floor with screws. We then put down a new lay of 3/4" plywood with lots more screws.  We had a number of squeaks, but Bob really made sure he eliminated them! 
    A new wet wall at the end of the tub was built. At this time, we also removed the old window and shifted the framing over about 2' as it was too close to the new tub location.  Quirky side note. In opening up the wall, we found that old window framing that had been closed up in the past and thus this was most likely the 3rd time, the window had been relocated in the history of the house!

     
    Day 3. Completed the install of a new Andersen window, then installed new exterior sidewall. Moving inside, we continued to set up for the plumber.


    Day 4. The plumbers arrive and quickly set about their work. First, they demolished the old heat and rerouted the heat line under the floor. (This bathroom will have new in-floor radiant heat.) Then they removed and relocated the vent, waste and water lines as the tub and vanity, have switched locations.  At the end of the day, we set the new tub into a supporting bed of structural mortar.


    Tub is flashed and ready for cement board. Blocking and temporary cover installedDay 5. Around the new tub, we installed blocking for balance bars and padded the walls as needed to allow the cement board to slide down past the tile flange on the tub. Adjustments were made in some of the framing else where in the bathroom and we also installed hurricane clips on the exposed rafters. We also installed a new fan/light fixture over the tub and then went up on the roof to remove shingles and install the fan exhaust port. While up on the roof, we also fixed a leaking, improperly installed pipe flange at the same time. 


    Day 6. The electrician arrives and removes all of the old wiring in preparation for a completely new rough including new home runs back to the service panel.  We had made his job easier by leaving out a section of the flooring and exposing the top of the wall on the wall below. This allowed him to fish new wires or home runs back to the service panel in the basement much faster and easier. This rough-in takes well over 8 hours to complete.


    Day 7-8. Plumbing and electrical inspections conducted by the town of Falmouth are completed and passed.


    Day 9. We install the newly upgraded insulation as mandated by code in the exterior wall and ceiling. Eladio Gore, Falmouth's Building Commissioner, stops by to sign off on the framing and insulation inspections. After his visit, cement board is installed around the tub and the final prep before the wall board is installed is completed.


    Day 10. New plaster board is installed on the walls and ceiling.


    Day 11. Plaster is skim coated onto all walls and ceilings and allowed to set. 

    Warmly Yours floor heat installed. Now dry fitting Ditra. (Orange layer) on topDay 12. Next up is the installation of the in-floor radiant heat. We use a product from Warmly Yours, which makes a heat element woven into  mesh. Installation requires you to take your time to plan and then properly install while avoiding damage to the product.

    Day 13. Our tile setter John, trowels a layer of thinset over the newly installed heat mat and will allow it set up before returning the next day.

    Day 14. Over the thinset and in-floor heat, John now installs a product called Ditra. This is an isolation membrane that is secured with thinset. Ditra provides significant support for the tile while allowing movement by the substrate, thus avoiding grout popping or tile cracking.

    Day 15. After setting the tile, John returns one more time to float grout into the joints of his tile install. When mixing the grout, he adds a product called Grout Boost which improves the stain resistance of the grout making it easy to keep the grout clean.

    Days 16-20. We are in the home stretch! We start the week by installing a new cherry vanity and linen storage. We also install wall cabinets over the toilet. Then we trim out the window, door and install new baseboard scribed to the tile floor. On the vanity, we install a nice one piece Swanstone counter that has a integrated sink and backsplash. 

    Around the tub, we install the Swanstone surround on the walls and ceiling. Into the surround, we also install a large storage alcove and balance bars for safety.

    Our painter Kemp, from Panda Painting works his magic by prepping, priming and painting the walls and ceiling. He then also stains all of the woodwork and after filling all of the nail holes, applies multiple layers of polyurethane to complete his work.

    Meanwhile the plumber Al, has returned to set the toilet, connect all of the waste and water lines, install the vanity faucet and drain, then complete the tub/shower trim. 

    Right behind Al comes Richard, AKA Sparky, who wraps up the floor heat install by connecting and installing the digital control pad. He then completes the trim out of the recessed lights and installs the sconces over the sink.

    Finally, (Are you going whew! yet?)  We drill and install the knobs at the vanity, change out the hinges and door knob to the bathroom with all new shiny chrome hardware. (Cape Cod salt air is tough on hardware) Install a new wood threshold at the bathroom entrance.

    We also install the Ark Shower panel at the tub. Then our final touch is to do a complete clean up working our way out of the house.

    Then we turn the bathroom back over to our clients Lary & Sue Ball who comment, "You've absolutely delighted us once again!" 

    The following week, we are visited by the town's inspectors who pass the work of our talented trades.

    Below are some iPhone pictures of the final result.

    Doorway shot of the completed bathroom. Tile looks fabulous!

    Lots of storage over the TOTO comfort height, one piece toilet

    Nice size cherry vanity and linen storage. Also easy to maintain Swanstone top 

    Kohler whirlpool bath. Ark spray panel. Symmons tub/shower controls-well made and have real weight to them. Surround is Swanstone. Light in ceiling conceals exhaust fan

     

     

    Wednesday
    Mar142012

    10+ Insider Tips For A Better Bathroom Remodel

    10+ Tips To Make Your Bathroom Even Better.

    1. Make sure there is adequate support under your new floor tile.  Typically 1.5" is sufficient.

    2. Have blocking installed in tub or shower walls for later installation of balance bars.

    3. Install a simple timer on your exhaust fan and run it for 20 minutes after showering.

    4. If you have stained wood in your bathroom, finish it with a polyurethane to block mildew growth.

    5. Do not use a flat paint in a bathroom. Use a washable paint.  Most paint brands have bath or kitchen specific paint.

    6. Consider a second mirrored recessed medicine cabinet in addition to the one over the sink.  This can be installed on another wall else where in the bathroom. You can specify an extra deep model for more room and can even order them with built-in electrical supply.

    7. Roll out metal baskets in a vanity may provide more storage for less money then drawers.

    8. Curved shower rods with a hook-less liner provides more elbow room and you can quickly remover the liner for washing when needed.

    9. Hinged spray panels keep water in while providing ease of access to the tub.

    10. If your toilet sweats, specify an insulated tank on your new toilet.

    +.  Invest your money to remodel your bathroom once. With the right materials and built for longevity, you will enjoy your new bathroom worry free for many years!

     

    Wednesday
    Feb152012

    4+ Reasons Our New Cabinet Line Is Perfect For Your Upcoming Cape Cod Kitchen Remodel

    1. All Wood Cabinets. Beautiful! Constructed with real wood and having features usually found in custom or upper end cabinets. Dovetail drawers, full extension hardware, 3/4" thick full depth wood shelves  and no particle board anywhere!  Full Lifetime warranty on the cabinets and hardware

    2. No Middleman. No Overpriced Showrooms. Leveraging the power of the Internet to bring you quality cabinets for your kitchen, bath and laundry room.  We buy direct from the manufacturer and handle every aspect from design to installation to final clean up.

    3. Fast Turnaround Time.  We can be installing your kitchen in as little as 2 weeks from the time your order is placed. Many other cabinet lines are running 8 weeks or more.

    4. Touch and Feel in the comfort or your own home. We'll bring door and finish samples for you to review. This will help avoid the feeling of been overwhelmed in showrooms filled with far too many options and choices.  

    +. Relax! We handle the details from beginning to end. No salesman handing your project off here. We'll work with you every step of the way to create the Cape Cod kitchen of your dreams: Installed right, as quoted and on time!

     

     

     

     

     

    Wednesday
    Feb012012

    Top 5+ Bathroom Remodeling Requests On Cape Cod

    We remodel a lot of bathrooms here on Cape Cod and that provides us some insight in to what homeowners want when they remodel. Below are the top 5+ requests from Cape Cod homeowners who are looking to improve their bathrooms.

    1. Bead Board Wainscot: This is a timeless look that when done right lends an air of elegance to a bathing space. Notice the emphasize on done right?  I've seen far too many bathrooms with cheap bead board paneling from the big box stores slapped up on the walls and finished with a flimsy molding. To be blunt, it's cheap to install...and looks it.  We use a product made by Nantucket Beadboard for our wainscot.  (At some point in the future, I will put up a post about installing and finishing beadboard.)

    Cost: Professionally installed beadboard, capped with trim and baseboard  will add $1200-$1500 to a typical bathroom remodel. (Finish painting is not included in the above figure.) 

    2. Pocket Doors: I personally love pocket doors.  In my dream home paid for by the shares I own in Facebook*, I would make just about every door into a room a pocket door topped by a transom window. (To do this  requires 10' ceilings.) I really like how you can slide a door out of sight, as it makes  a room seem larger and more open especially in a bathroom that is tight for space.  Some people don't like pocket doors as they have had problems with them and I cannot blame them, as I have seen some atrocious installs over the years. And yet, pocket doors can be be trouble free if done right. The secret is patience and taking the time to plumb and level the door at installation and using ALL of the hardware supplied by the frame manufacturer.

    Cost: Professionally installed pocket door, framing, door and hardware. Sheetrock finish, will add $1800-$2500 to a typical bathroom remodel. These can be a complex install when structural work is involved. Not all applications will allow for a pocket door installation. Be sure to consult your local building department on applicability.

    * I don't own any shares in Facebook. Although I wish I did!

    3. Tall Everything: The days of stooping over and brushing your teeth at a 24" high sink are over. Just about every vanity we have installed in the last few years, finishes between 34" and 36" in height. Much more comfortable for many users. Toilets are also available in what is now known as comfort height. (AKA. chair height.) We also install shower controls and shower heads at a tall height for ease of use.  One thing I usually do at the planning stage is to ask my clients to share with me, what heights would be comfortable for them. This small request can make a big difference when they start using their newly remodeled bathroom.

    Cost: Upgrading to tall everything usually costs 15% or more over standard height items.  

    4. Tubs into Showers: Many of our projects involve converting a tub into a showering space. This is an increasing trend as many homeowners are electing to stay put and make their house on Cape Cod, a "Forever home." In doing so, many homeowners are looking at how to create one level living by having all of the main rooms on the same level. (Usually the first floor.) Often times, we replace the 5' foot tub with a step in shower of the same length and width thus creating an easily accessible, safer and spacious showering space.   

    Note. Converting a tub to a shower on the 2nd floor is rare because the Massachusetts building code requires upgrading the existing 1-1/2" drain line to 2" drain line for a new shower install. This often requires opening up a significant portion of the floor to locate and tie into the main drain. Thus can be pricey. 

    Cost: Professionally installed tub to shower replacement including new controls, shower head, etc. and repairing the walls around the unit, usually start at about $3100. (First floor only.) 

    5. Tile and Glass: Along with converting the tub to a shower, we're seeing more tile shower surrounds and clear frameless glass doors.  The tile will often have a decorative element and many projects will have the tile all the way up to the ceiling as well as on the ceiling. One suggestion we make, is to have a solid surface or cast iron base rather then tile for a cleaner look and to provide for easier cleaning. The glass doors which can be bypass or swinging doors allow you to see the tile work and adds a rich elegance to the bathroom.  We often specify the 3/8" or 1/2" thick glass, especially for the bypass doors as the thinner glass rattles when you slide it from side to side.

    Cost: Professionally installed shower surrounds with tile and glass. Usually the most expensive part of any bathroom remodel. $8,000 and up. 

    +. Laundry Center: We have had quite a few bathroom remodels that involve taking a space within the bathroom or from an adjacent room or closet and converting it to a Laundry Center. Because of space constraints. Most of them require the use of a stacked washer/dryer instead of a conventional side by side washer/dryer.   Creating this space, added significantly to the cost of the bathroom remodel and yet, every client we have done it for, has said it was well worth it!

    Cost: Hard to pin down as many factors involved. $1800 for a basic relocation to $4500+ for a complex install. Does not include stacked unit which can run $1200 to $4500. 

    There you have it, the top five+ requests for features in a bathroom remodel from your fellow Cape Cod homeowners.  It's my experience that any bathroom that has any or all of the features above makes the overall project far more worthwhile! 

    If you have any questions about the projects noted above, send me an email to JSC@AtDesignREMODEL.com

    Thursday
    Jan262012

    Remodeling Costs On Cape Cod 

    We frequently get inquiries about the cost of remodeling projects here on Cape Cod. Given that every house, project and homeowner is different, it can be challenging to provide a specific number without going through the process of looking at every aspect of a project which is time consuming.  Design, selecting products and fixtures, calling suppliers and trade partners.  Which can on average take about 8-12 hours on a small bath remodel!

    Enter Remodeling Magazine, which is one of the best trade magazines for Remodelers and for the last 23 years, has undertaken the research, leg work and math on an annual basis on the costs of a wide range of projects. Below are some examples of projects that we extracted from their data.  These are similar to  projects that @design REMODEL has completed for clients across Cape Cod.  

    1. Basement Remodel $66,675
    2. Bathroom Addition $40,753
    3. Bathroom Remodel $17,460
    4. Minor Kitchen Remodel $19,885
    5. Major Kitchen Remodel $58,982 

    For the most part, we have found that the project costs compiled by Remodeling Magazine are consistent with what we and others in the market are charging. While there is variation from project to project, the averages are right in line with reality.   

    In many ways, the costs of remodeling have followed a similar trajectory of the cost of purchasing a new car or truck. Costs have escalated as manufacturers add new features, use new materials and add higher labor costs, research and development and regulatory compliance, it all adds up!

    It's not all unusual for a new fully loaded SUV  to cost upwards of $60K much like the Major Kitchen remodel listed above at about $59K.  Yet, after 5 years, most vehicles are heavily depreciated and you are ready for a new one. The kitchen on the other hand, is only one quarter into it's life expectancy of 20 years!

    Note: The costs above are averages for New England and are for projects considered "midrange" in scope and cost.

    “© 2011 Hanley Wood, LLC. Complete data from the Remodeling 2011–12 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.”

     

    Sunday
    Dec182011

    Cape Cod Kitchen Design & Usability Idea: Lighting

    Lighting The Way

    Many of the Cape Cod kitchens we remodel, usually need lighting upgrades as the existing lighting is insufficient.  I've seen kitchens lit by a single fixture located in the center of the ceiling and complimented by a small light over the stove. Lots of shadows in those kitchens!  Even worse, are kitchens lit up by industrial florescents that flood the space with blindness inducing bright, sterile, white light. 

    The right lighting in a kitchen can make it safer to work in, easier to see (especially as we get older) and can create a warm, welcoming feel for everyday use or while entertaining family and friends. With forethought and good planning, this is easily accomplished in any size kitchen.

    Let's review the types of lighting typically used in most kitchens.

    Types of Lighting

    Overall
    This type of lighting is the most common, it can be a simple centralized fixture mounted on the ceiling or multiple fixtures either recessed or surfaced mounted and placed at different locations around the kitchen. Properly selected and placed, these fixtures can provide for most of your lighting needs.

    Task
    When you really need to shine light on your workspace, task lighting is the way to go. In a kitchen, this will usually mean lights mounted on the underside of the upper cabinets. Having lights properly mounted as such, will flood the counters and workspace with lots of light.  For task lighting, I would recommend that LED lighting be installed as it provide multiple benefits in reduced energy use, less heat shred then other types of fixtures and LED'S provide bright and dimmable lighting.  It's interesting to note  that the Starbucks coffee chain recently retrofitted their stores with LED lighting which significantly reduced their energy usage and costs. 

    Also, task lighting can be a overall lighting fixture placed in a specific location. An example of this, is installing a light over the sink area with a high wattage bulb that floods the sink with light.

    Mood
    If your kitchen is large enough to function as a entertainment space, then the right mood lighting can create a warm inviting feel that may make it difficult for guests to leave. It's possible that the right lighting, will make food look and taste better. Although some dishes will be beyond rescue!  We often create mood lighting in a kitchen by simply replacing standard switches with dimmer type switch's which will allow you to control the intensity of the light.

     

    Types of Fixtures

    Ceiling Recessed is the most popular type of fixture used for overall lighting. They come in multiple sizes and style of trims.  (Trims are the decorative surround that the bulb sits inside.) You can also install low voltage lights especially if you want a small, low profile light fixture.  Usually you can use a flood type bulb or a focused beam bulb in these fixtures depending upon where and what you want to illuminate.

    Be sure to install IC type recessed fixtures (As shown right) anywhere that they will come into contact with insulation. This allows for the insulation to be installed up to and over the fixture. Do not use non-IC fixtures below a non-heated space such as an attic. Doing so, essentially creates holes in your ceiling for heat to escape and will increase your homes energy usage and costs.

    Surface Mounted.
    We have had kitchen renovations here on Cape Cod where we have specified the use of surface mounted fixtures. In some cases, the period style and age of the home made it an appropriate choice and other times, high ceilings allowed for hanging fixtures.  Surface mounted fixtures can create style and bring color into your kitchen as shown in the picture to the left.  If a kitchen has an island, we usual install pendant lights over it and then install recessed lights in other areas of the kitchen.

    Wall Sconces. Although rarely used in a kitchen, if you have the wall space and it's in an ideal location, a wall sconce can add style and set a mood. With a  dimmer, it can also function as a nightlight for those late night raids on the fridge!

     

    Under Cabinet lighting works great in really lighting up workspaces and we often use dimmable LED lighting under our cabinets. One tip: Make sure the fixtures are mounted in the front of the cabinet not the back. Installing the fixture forward, brings more light out over the countertop and makes the fixture it's self less visible.

    In Cabinet Lighting can also create a fabulous backdrop while showing off your Waterford Crystal collection. Typically we use dimmable "puck" style fixtures mounted on the ceiling of the cabinet. Another tip: Replace the wood shelves in the cabinet with glass shelves to really allow the light to shine through!

    Here are some links to some of our favorite light fixtures.

    Rejuvanation. Great period fixtures and fabulous quality!

    Hubbington Forge. Very elegant old world fixtures.

    Restoration Hardware. Love the mix of old and new.

     

    Hopefully, I've lit the way forward in helping you select the right lighting for your new kitchen!  Feel free to comment or ask questions.

     

     

    Thursday
    Dec082011

    West Falmouth Kitchen Remodel: Start to Finish

    This month finds us remodeling a kitchen in West Falmouth. This kitchen remodel will replace a typical eighties builder grade kitchen which primarily consisted of laminate cabinets and counter tops.  The redesign of the kitchen improves the look, layout and provides for more storage.

    The Homeowners selected a frameless cabinet in a natural maple finish manufactured by Dewils.  The countertop will be granite and the apron front deep stainless steel sink will be a focal point in this kitchen.

    Follow along as we document the progress, the challenges and the final outcome in this soon to be fabulous makeover!

    Demolition of the old kitchen was tacked by the homeowners. They did such a good job, that I asked if they wanted to hire on as my demo crew!  When we arrived to start, the space was clean and ready for us to take over. The old cabinets and counter tops were recycled into storage/workspace in the garage.

    One of the first things we did, was set up a dust wall with a zipper door as shown in the picture at left. This dust wall will help keep the spread of dust to a minimum. 

     

    As shown in the picture above, our first task was to remove a section of the drywall so the Electrician could update the wiring and placement of assorted electrical devices. We also needed to provide a new backer or substrate for the tile back-splash to come. If you look at the picture closely, you will see that the seams will be hidden by the base and upper cabinets. We also removed just over the width of a standard drywall width of 48"  This will allow for faster and neater installation of new drywall. 

    We also removed some of the plywood on the floor as it was damaged and weak in some spots.  Unfortunately at this point, we discovered that the sub-floor consisted of 1/2" plywood which is insufficient to support the new tile. A typical-sub floor will have at minimum, 3/4" thick plywood supported at all edges.

    It was decided to install an additional layer of 1/2" plywood laid perpendicular to the existing sub floor to provide more support under the large/substantial tile that is going to be installed.

    The picture above shows the exterior wall where we are preparing to open up and install an additional window while replacing the window on the left with a new Andersen gliding window.  We will need to relocate wiring and carefully measure placement of the new windows, as we plan to install several receptacles and switches between the window bottom and the top of the counter top. Space will be at a premium here!

    Meanwhile on the exterior, we have constructed and set up staging over the stairs. In this picture, we have carefully removed the existing shingles for reuse around the new windows.  Soon this wall will show two new Andersen gliding windows!

    Next up, is framing the window opening and preparing the flashing system for the windows.  As you can see in the photos below, we have added an opening for the new window and now we are preparing the openings with flashing on the sill and around the edges.  

     

    The windows are now being set in the openings. At this point, we make sure the windows are level and square before securing them permanently in place.

    Here is a picture of the exterior with the shingles that were saved during removal, now reinstalled around the new windows.

    On the interior, the window framing is complete, the electrician has completed his rough wiring and new insulation has been installed as seen in the photos below. At this point, we have gotten the inspections we need from the town and are now ready for the installation of the sheetrock.

     Just before the sheet rock is installed, we cover the insulation on the exterior wall with 4 mills plastic which acts as a vapor barrier.  You can also see on the floor, that we have installed new plywood fastened with screws. This additional layer of plywood, will provide strong support for the new tile.

    Coming up: Mud-time! The seams on the drywall will be coated with mud-aka Joint compound which will hide the seams.  We'll also be slapping mud or thinset down on the floor as we install new tile. 

    In the above picture, you can see that the team from Spooner Drywall has worked their magic in patching the walls.   They also worked magic on the the ceilings which have the dreaded popcorn finish on them. In fact you cannot see any evidence where the ceiling was patched at all!

    On the floor, the bright orange covering you see is a product called Ditra which is a provides great support under tile and also isolates the tile and grout from the movement of the wood below. Ditra is used by professional tile installers the world over.  Here, the Ditra is has been dry-fitted and is awaiting the tile setting to trowel down a layer of thinset mortar over the plywood. He will then embed the Ditra.  The tile setter will trowel more thinset onto the Ditra and set the tiles. Going through this multi step process will ensure a strong floor that resists movement and cracking.

    Here is a snapshot of the cabinet install in progress.

    The space above is for the sink base and you can see how planning ahead avoids many problems later.  1. We left out a section of tile to make it easier to install the water piping. If we did not, the plumber would have to drill through the tile inside a very confined space. 2. We drilled the holes for the water piping ahead of time. 3. These cabinets require a site built base and in building the base for the sink cabinet, we created a chase for the piping for the dishwasher to be threaded through in the right hand corner.

    As shown above, the sink base is now installed and you can see that multiple holes have been made to accommodate the plumbing, electrical and the new sink.

    The picture above shows the stainless steel sink now installed.  Coming up. Bumps in the Road!

     

    As you can see in the pictures below, all of the cabinets are installed and the granite has been carefullly put in place and then we hit a couple of bumps in the road.

     Turns out the interior finish on this stove was defective. The homeowner decided that they wanted to replace it with another brand which in turn required returning the over the stove microwave. This delayed installing the backsplash tile. 

    On top of this, the weight of the refrigerator punched a hole in the tile as we were shifting it in to place. If you look at the photo below, you can see a round hole punched through the travertine tile which is somewhat a delicate tile.  The kicker was, that the damaged tile was partly under the refrigerator side wood panel which would have to be removed so that the tile could be replaced. This in turn held up the completion of the upper cabinet moldings...

    Fortunately, replacing the tile was a relatively simple if a bit messy task that was done quickly and efficiently by the tile installer.

    At the start of the tile install for the backsplash, it was found that the varying thickness of the different tiles did not work well together. The homeowner decided to go with a different look as you can see in the pictures below. 

     

     All Wrapped Up and Done!

     

     

     

     

    Sunday
    Dec042011

    Cape Cod Kitchen Design & Usability Idea: Storage

     This is the first in a occasional series of tips about designing and making more user-friendly your new kitchen. 

    Storage for pots and pans.

    It makes me crazy to see kitchens with nothing but marching rows  upon rows of doors. Why? because it usually means that the cook is wasting time and steps every time they want to retrieve cookware from the cabinets below. 

    In many kitchens, the cook will stoop down, open a cabinet door, reach in and roll out the tray within to select a piece of cookware. Then they have to roll the tray shut and close the door.  Not a big deal, yet multiply that many times over the course of cooking meals and it gets a bit annoying doing the multi-step.

    My solution in many of the kitchens I've designed and built, is to specify a base cabinet or two as all drawers. Usually they are at 32"- 36" wide and have one shallow top drawer and two tall drawers below as shown in the picture to the left. This set-up allows for stacked storage of pots and pans and  in one motion allows you to open, view and retrieve your cookware.  Plus, having an entire base cabinet all drawers will break up the rows of marching doors.

    Be sure to specify heavy duty full extension hardware on these drawers as the pots and pans can add up in weight.

     I also like doing this as it allows for a really wide top drawer to store cutlery and cooking tools all in one place and still keep them neat and organized.

    There are a number of storage options for cookware such as pot racks and corner cabinets but just having nice big drawers appeals to my practical nature. Out of sight, out of mind, yet easy to see and use!